PEGASUS AIRPARK
MASTER PLAN
Phase One through Four and the Hangar area consists of 186 home sites, 82 aviation lots with runway
access and 104 irrigated Equestrian lots. The Master Plan shows the four phases and hangar area with
a separate south entrance.  Three hangar buildings totalling 47 units are completed on the west side of
the hangar and box hangars are available.  Three more larger hangar buildings are planed for the east
side.  The 100 LL aviation fuel facility was operational in December 2007.
Return to Home Page
E-MAIL